Serbia presents a unique opportunity for international companies looking to establish or expand their presence in the European Union (EU) market. With its advantageous trade agreements, geographic loc
Detailed overview of procedures for technical control of PGD and interdependencies with quality management in construction
In Serbia, the technical control of the Preliminary Design (PGD) is a mandatory process dictated by the Law on Planning and Construction. This procedure ensures that all project documentation meets bo
Waste management and environment regulations for industrial facilities in Serbia
Investors looking to establish industrial facilities in Serbia must prepare a range of environmental and technical studies to comply with national regulations. These studies are essential for obtainin
Manufacturing in Serbia and export opportunities: Incentives and operational benefits
Serbia has become a prime destination for manufacturing, attracting foreign investors with its strategic geographic location, extensive free trade agreements, competitive operating costs and robust go
Construction design phases PGD, PZI and Supervision of Works in Serbia
In Serbia, the planning and construction process is structured around several key phases, including the Preliminary Design (PGD), Detailed Design (PZI) and Supervision of Works. These phases are gover
Plant engineering, design, permiting, construction, commissioning, operation, role of OE
Plant engineering is a complex discipline encompassing various activities throughout the project lifecycle—from conceptual design and feasibility studies to construction, commissioning and operation.
EPC FIDIC contracts, Owners Engineer supervision of works for compliance and quality
The role of the Owner’s Engineer (OE) in supervising EPC/FIDIC contracts is indeed pivotal for project success. Here’s a concise breakdown of the OE’s responsibilities during various project phases: 1